More vetted deals in less time.
Targeted data rooms for your mandates: vetted solar and storage projects, prepared decision-ready. DSCR, LTV and IRR pre-underwritten, filtered to ticket size and region.
~€57,000 at risk in a 10 MW portfolio from opaque post-investment tracking. NEXA closes that gap with live monitoring per asset.
You finance rather than invest? To the banks page
Pipeline volume
2,28 Mio €
3 sites
Portfolio IRR (investor)
Ø 8,2 %
DD pack
Ø 80 %
complete
Capital-ready
1
This is NEXA ONE with example data. Open investment memo
Deal flow isn't the problem. Review time is.
Every transaction a special case, every due diligence a new format, and after closing the tracking problem starts. NEXA standardises review and monitoring for solar and battery storage in the 2 to 30 MW corridor.
Projects on one side. Capital on the other. NEXA in between.
Illustrative pipeline, example data
Five asset classes on one platform.
The same review format across all five: what differs is the asset, not the paperwork.
Rooftop PV
Commercial roofs, behind-the-meter
50 kWp - 5 MWp
Solar farms
Ground-mount on open land
1 - 30 MW
Carport-PV
Parking areas with charging
100 kWp - 2 MWp
Battery storage (BESS)
Standalone or co-located
2 - 30 MW
Agri-PV
Dual-use agricultural land
Case by case
Every project carries one of three states; you filter for the stage your review starts at.
One DD pack per project in the NEXA format: identical structure, directly reviewable.
Deal flow filtered to ticket size, region and instrument per mandate.
From score to the right capital.
NEXA Match ranks capital candidates against your project: eligibility, indicative terms and confidence, before the first conversation happens.
Checked against every stored capital profile — 4 match project and mandate.
Illustrative figures, anonymised candidates. Real matching happens in NEXA ONE.
The NEXA Score: five weighted factors, in the open. No black box.
Example data, not a real property.
Built for review, not for the pitch.
REGULATED BY DESIGN
Capital introductions within the scope of § 34f GewO. No licence under § 32 KWG or § 17 KAGB required: no deposits, no fund management. The structure deliberately operates without a banking or AIFM licence.
EU TAXONOMY
Art. 10d by design: reporting data comes from live monitoring, not retrospective collection. CSRD phasing 2026-2028 is built into the data model.
MARKET VALIDATION
The marketplace for utility-scale assets is proven and worth billions. In the 2-30 MW mid-market corridor, behind-the-meter and below the utility threshold, there is no standard. That corridor is ours.
Review a deal before the first call.
Illustrative figures, not a specific property
Questions from investors
More on this: All questions · NEXA ONE · Guide: Investing in German commercial solar
Define your mandate. Review your first deal.
Or review first: request the DD sample pack